The remodeling of Rollins Chapel last summer included, it will be remembered, a new arrangement of the speaker's desk and, consequently, of the general seating plan of a large part of the building. By this arrangement, a section of seats in the center of the chapel was placed back to the pulpit. General dissatisfaction on the part of the occupants of these seats has arisen; as a result, during the Christmas recess such modification of the original plan has been made as to. enable every member of the audience to face the speaker.
More extensive alterations in the Medical Building were likewise completed during the recess. The south wing of the building has been completely remodeled for the use of the Anatomy Department. The present arrangement provides a commodious recitation room, a laboratory, a preparation room, a storage room, and an elevator for the carriage of material to be used in class room demonstration.